Building the Vision

Tait Ground Floor Bar/Cafe Project

CityBar, our new bar/cafe, was completed in September 2014 on the ground floor of the Tait Building.

This new space provides fantastic new facilities, designed through consultation with the Students' Union, and replaces the previous facility behind University Building.

The new facility offers flexible space that can be used for events, socialising and group working/meetings, all within a modern, welcoming setting.

The space is accessible via a new entrance on Goswell Road and will contribute towards improving Tait Building's visual permeability at ground floor level. Through the introduction of two new glazed sections of the façade, the bar/cafe will benefit greatly from much more natural light than its previous home.